Collie 1
COLLIE · WESTERN AUSTRALIA

Your next data centre campus starts with the right opportunity. 

Discover 57 hectares in Collie, Western Australia, strategically positioned for high-capacity grid connectivity, high-speed, low-latency fibre infrastructure, and DA-approved solar development — creating the foundation for a scalable, renewable-powered data centre campus.

Interested to build it together?
Let’s talk.

✓ ACHIEVED

Approximately 57 ha under DEIH ownership

Around 23 ha rezoned for Light Industry

20mw solar farm + BESS development approval

◯ Power pathway

330 kV transmission infrastructure near Collie.

Planned expansion supporting up to 1.6 GW of regional renewable generation connections by 2030

Potential staged, large-scale grid connection for DEIH, subject to Western Power assessment

◯ FIBRE network

Telstra’s Aura fibre network serves the Collie region

High-capacity connectivity for AI and data-centre applications

Site access and connection arrangements to be confirmed

◯ UNDERWAY

Strategic tenant discussions

Located in a region supported by WA’s Govt. industrial transition strategy

Grants applications

THE window of OPPORTUNITY

A rare convergence in one master-planned location

Renewable energy generation, industrial-zoned land and scalable powered infrastructure rarely come together in one place. In Collie, they do — creating a platform for industry, manufacturing and innovation in a region built for it. This is more than land for sale. It's a chance to grow inside an energy and industrial ecosystem, powered by clean energy from the moment you arrive.

  • Renewable energy generation & storage on site
  • An embedded network delivering power directly to tenants
  • Industrial-zoned, infrastructure-ready land
  • Backed by a region in active energy transition
  • Direct connection to to Telstra Aura Fibre Backbone
Collie 2

Anchor tenant · proof point

Collie MMC Manufacturing & Centre of Excellence Precinct

SIPOD Global, PLANM and Jubilee Living are proposing an integrated green manufacturing, Modern Methods of Construction (MMC) and training precinct within the Collie Energy Industrial Hub. The precinct would combine SIPOD’s low-carbon construction materials, PLANM’s advanced modular manufacturing capability and Jubilee Living’s housing delivery expertise to establish a significant new manufacturing industry in Collie, targeting production of up to 1,000 dwellings per year for regional and broader Western Australian markets.

Central to the precinct is an MMC Centre of Excellence, providing a direct training-to-employment pathway in partnership with Southwest TAFE. The initiative is designed to support Collie’s economic transition by creating long-term skilled employment, retraining workers from traditional energy industries, developing advanced manufacturing capability and building new demand for local supply chains. The project aligns strongly with the WA Government’s Just Transition and Collie Industrial Transition Fund objectives, positioning the precinct as a potential anchor development for the Collie Energy Industrial Hub.

  • Regional jobs
  • 1,000 Homes Annually
  • Green Manufacturing
  • Workforce Transition
  • Integrated MMC Ecosystem
  • Government-Aligned Transition
SIPOD   PLANM  MMC   2

THE INTEGRATED ECOSYSTEM

One platform
Many ways to grow

Energy, industry and innovation, master-planned together, with advanced digital infrastructure emerging as a future layer within the same ecosystem.

CORE

Renewable Generation

Utility-scale solar capability feeding the hub directly — clean power as the foundation under everything.

CORE

Battery Energy Storage

Grid stabilisation and energy resilience, so power stays reliable around the clock.

CORE

Industrial Operations

Renewable-powered industrial tenancy for manufacturers, processors and trade businesses.

CORE

Manufacturing & Workforce

Advanced manufacturing that creates regional jobs and training outcomes for Collie.

CORE

Embedded Energy Network

A private electricity network across the site — tenants draw clean, local renewable power directly from the hub, behind the meter.

EMERGING

Digital & Compute Capability

Future-ready, renewable-powered digital infrastructure — an emerging layer within the ecosystem.

THE ENERGY HUB

An integrated energy network

This isn't simply generation. It's an integrated energy ecosystem — renewable generation, battery storage and an embedded network — designed for real industrial consumption, behind the meter. That embedded network is fast becoming the project's key differentiator: a private electricity network across the site, so tenants draw clean, competitively-priced power directly from the hub rather than relying solely on the main grid — with the resilience that comes from storage built in from day one.

  • Utility-scale solar
  • Battery storage (BESS)
  • Embedded network
  • Behind-the-meter supply
  • Energy resilience

FEASIBILITY-STAGE CAPACITY

16 MWp
Solar PV

42
MW
Battery power

187.4 MWh
Battery capacity

38.3
MW
Grid connection

Collie 3
Collie 4

THE INDUSTRIAL HUB

Powered industrial infrastructure

Not just land lots — scalable, energy-integrated allocations built for businesses that need reliable, competitively-priced power to operate and grow. Connected to the RAV heavy-vehicle road network and sized to your needs, the hub is ready for manufacturers, processors, logistics, cold storage and high-energy-use operations.

  • Advanced manufacturing
  • Processing
  • Cold storage
  • Logistics
  • Embedded renewable access
  • Flexible allocations
Collie 5

Why Collie

Strategic infrastructure positioning.

Why Collie

Strategic infrastructure positioning

A resources town in the WA South West, ~200km south-east of Perth and 55km east of Bunbury — and one of the State's defining energy-transition regions.

01

Existing transmission

Established grid infrastructure already in place.

02

Transition region

A State-priority energy-transition economy.

03

Industrial heritage

A century of powering Western Australia.

04

Expandable land

Room to scale powered capacity over time.

05

RAV road network

Heavy-vehicle access connected to the site.

06

Dual fibre network

Direct capital-city connectivity with regional access, high-speed connections and local fibre access for Collie.

Collie 6

Why Collie

Strategic infrastructure positioning.

Regional impact

A hub built for Collie.

As Collie transitions to new forms of industry and power, this project is designed to bring lasting jobs, skills and economic growth to the community — not just infrastructure to the map. Every tenant, every megawatt and every training place is a step in a regional transition the whole community has a stake in.

$700M

WA Collie Transition Package

$230M

Collie Industrial Transition Fund (CITF)

Regional Jobs

Sustainable long-term

Training

Workforce development outcomes

EMERGING WITHIN THE ECOSYSTEM

Advanced digital & compute infrastructure.

As part of its broader hub, DEIH is positioned to support renewable-powered computing and Australian data hosting, with potential sovereign solutions tailored to customer ownership, security and operational control.

FUTURE-FOCUSED · POSITIONED, NOT PROMISED

Renewable-Powered Compute

Compute capability supplied by on-site clean energy.

Advanced Digital Infrastructure

Future-ready capacity for digital infrastructure operators.

Future Data Centre Opportunities

Land and power positioned for future data centre demand. Utility-scale solar capability feeding the hub directly — clean power as the foundation under everything.

Blockchain Integration

Explored as a future infrastructure utility, not speculation.

Telstra’s Aura fibre connects Collie to all Australian capitals, supporting high-capacity, low-latency AI and data-centre connectivity.

Digital infrastructure could become a major commercial component, while remaining an emerging opportunity within the hub’s balanced regional energy and industrial ecosystem.

Collie 7

Why Collie

Strategic infrastructure positioning.

THE PATHWAY

A staged infrastructure pathway

The hub is being built in deliberate stages — energy and industry first, with digital capability scaling as demand matures.

01

DA approvals

Rezoning & development approvals, with Shire support.

02

Stage 1

First infrastructure-ready industrial allocations.

03

Energy infrastructure

Solar, storage and grid connection delivered.

04

Industrial integration

Tenants, manufacturing and workforce activation.

05

Compute expansion

Digital infrastructure scales as demand matures.

23 ha Light Industrial rezoning achieved · Solar Farm Development Approval secured to 12th of March 2027 · renewable energy feasibility completed.

GOVERNMENT BACKING

Strategically aligned, and supported

As energy-intensive digital demand grows, the project is positioned to support future compute-intensive infrastructure — powered by renewables, as one layer within the broader hub.

$700M

Collie Transition Package

Supports large-scale industrial projects delivering long-term, sustainable jobs in Collie, and can fund project-ready industrial land. Part of the WA Government's $547.4M Collie Transition Package (2022).

$60.85M

Regional Economic Development (RED) Grants

Unlock government funding to accelerate regional growth—creating jobs, attracting investment, expanding industry, and turning ambitious projects into long-term economic drivers for regional Western Australia.

Most major grants require land to be secured or under serious negotiation — securing a position here can support your application.

PARTNER WITH US

Strategic participation opportunities

The hub is already taking shape alongside a group of established partners. Early-stage participation remains available across the ecosystem — from energy and industry to the emerging digital layer. Tell us about your needs, and we'll shape a position around them.

OPEN TO

Industrial tenants
Manufacturers
Renewable operators
Infrastructure capital
Battery technology partners
Digital infrastructure partners

CONTACT

Let's talk about your place in the hub.

Tell us as much as you can about your business's land, power and location needs so we can make sure you get what you need.