CORE
Utility-scale solar capability feeding the hub directly — clean power as the foundation under everything.
A renewable-powered industrial and technology ecosystem, turning clean energy into industry, jobs and lasting opportunity in the heart of WA’s energy-transition region.
Purchase of 57ha of land in WA
20mw solar farm + BESS development approval
23ha light industrial rezoning approval
Extension to March 2027
Feasibility study completed
Draft lot concept design
Strategic tenant discussions
Grants applications
Renewable energy generation, industrial-zoned land and scalable powered infrastructure rarely come together in one place. In Collie, they do — creating a platform for industry, manufacturing and innovation in a region built for it. This is more than land for sale. It's a chance to grow inside an energy and industrial ecosystem, powered by clean energy from the moment you arrive.
Energy, industry and innovation, master-planned together, with advanced digital infrastructure emerging as a future layer within the same ecosystem.
CORE
Utility-scale solar capability feeding the hub directly — clean power as the foundation under everything.
CORE
Grid stabilisation and energy resilience, so power stays reliable around the clock.
CORE
Renewable-powered industrial tenancy for manufacturers, processors and trade businesses.
CORE
Advanced manufacturing that creates regional jobs and training outcomes for Collie.
CORE
A private electricity network across the site — tenants draw clean, local renewable power directly from the hub, behind the meter.
EMERGING
Future-ready, renewable-powered digital infrastructure — an emerging layer within the ecosystem.
This isn't simply generation. It's an integrated energy ecosystem — renewable generation, battery storage and an embedded network — designed for real industrial consumption, behind the meter. That embedded network is fast becoming the project's key differentiator: a private electricity network across the site, so tenants draw clean, competitively-priced power directly from the hub rather than relying solely on the main grid — with the resilience that comes from storage built in from day one.
16 MWp
Solar PV
12.6 MW
Battery power
56.3 MWh
Battery capacity
20.5 MW
Grid connection
Not just land lots — scalable, energy-integrated allocations built for businesses that need reliable, competitively-priced power to operate and grow. Connected to the RAV heavy-vehicle road network and sized to your needs, the hub is ready for manufacturers, processors, logistics, cold storage and high-energy-use operations.
A resources town in the WA South West, ~200km south-east of Perth and 55km east of Bunbury — and one of the State's defining energy-transition regions.
01
Established grid infrastructure already in place.
02
A State-priority energy-transition economy.
03
A century of powering Western Australia.
04
Room to scale powered capacity over time.
05
Heavy-vehicle access connected to the site.
06
Direct capital-city connectivity with regional access, high-speed connections and local fibre access for Collie.
As Collie transitions to new forms of industry and power, this project is designed to bring lasting jobs, skills and economic growth to the community — not just infrastructure to the map. Every tenant, every megawatt and every training place is a step in a regional transition the whole community has a stake in.
WA Collie Transition Package
Collie Industrial Transition Fund (CITF)
Sustainable long-term
Workforce development outcomes
As energy-intensive digital demand grows, the project is positioned to support future compute-intensive infrastructure — powered by renewables, as one layer within the broader hub.
Compute capability supplied by on-site clean energy.
Future-ready capacity for digital infrastructure operators.
Land and power positioned for future data centre demand. Utility-scale solar capability feeding the hub directly — clean power as the foundation under everything.
Explored as a future infrastructure utility, not speculation.
The digital layer may ultimately become one of the hub's largest commercial components. For now, it sits as an emerging strategic opportunity within a balanced, regionally-anchored energy and industrial ecosystem.
The hub is being built in deliberate stages — energy and industry first, with digital capability scaling as demand matures.
DA approvals
Rezoning & development approvals, with Shire support.
Stage 1
First infrastructure-ready industrial allocations.
Energy infrastructure
Solar, storage and grid connection delivered.
Industrial integration
Tenants, manufacturing and workforce activation.
Compute expansion
Digital infrastructure scales as demand matures.
23 ha Light Industrial rezoning achieved · Solar Farm Development Approval secured to 12th of March 2027 · renewable energy feasibility completed.
As energy-intensive digital demand grows, the project is positioned to support future compute-intensive infrastructure — powered by renewables, as one layer within the broader hub.
Supports large-scale industrial projects delivering long-term, sustainable jobs in Collie, and can fund project-ready industrial land. Part of the WA Government's $547.4M Collie Transition Package (2022).
Unlock government funding to accelerate regional growth—creating jobs, attracting investment, expanding industry, and turning ambitious projects into long-term economic drivers for regional Western Australia.
Most major grants require land to be secured or under serious negotiation — securing a position here can support your application.
The hub is already taking shape alongside a group of established partners. Early-stage participation remains available across the ecosystem — from energy and industry to the emerging digital layer. Tell us about your needs, and we'll shape a position around them.
Tell us as much as you can about your business's land, power and location needs so we can make sure you get what you need.